adjusted price是什么意思

2024-05-16

1. adjusted price是什么意思

adjusted price
调整价

Price is adjusted for inflation.	
因通货膨胀而调整价格.

adjusted price是什么意思

2. fit是什么意思

「秒懂百科」一分钟了解我要Fit-Fit

3. 请帮忙翻译下

工程用词很多啊:

   Inspection intention, according to local city of potential students, the school buildings, drafting, architectural form location, traffic, environmental aspects of recruit students, the influence of construction cost estimation, investigation report Singapore headquarter, provide data according to the headquarters of decision-making.
 Protocol architecture design, design documents, participate in the school of design process, to ensure that the school's architectural style and the use function of the international school. Meet
 School construction process, make progress and quality requirements, and plan according to the strict requirement plan and specification contractor. Lead the team construction process, prevent supervised the quality problems, or time limit, maximum saving optimization scheme of construction and operation cost of the school.
 Large equipment procurement and negotiation.
 School built, in charge of the school building facilities and equipment repair and maintenance (central air conditioning, fire control, water and gas pool, etc.). Compile plan, organize various equipment inspection, testing. If there are hidden trouble, immediately, in order to ensure maintenance of equipment, safety operation.
 organization department service to its clients, schools within the relevant departments, or a sudden stop operating problems (equipment, facilities, etc.), guiding team timely resolved as soon as possible reason analysis, the normal operation, guarantees the school.
 National each branch as demand to adding or decorate afresh, responsible for the new project or decorate the scheme of organizational work, after the formation of multiple inquiry, comparison, determine the construction or supply unit.
 collect data and the cost of equipment, equipment operation data, operation.
 Calculation and report to the school every year of operation, maintenance and the budget approved after operation cost, endeavour to ensure that does not exceed the budget.

 Participate in project construction contract, negotiation, the use of specialized knowledge and understanding of the construction market, reasonable construction units, including reduced offer only factory (G1 phase 3-4, office 70,000 square meters, the restaurant floor 12,000 8,500 square meters, 3 tier 1 3,000 square meters storehouse safety after several rounds of bargaining,) for the company to save
3,000,000 yuan.
 Project construction process, responsible for the management of project quality, cost and time limit, daily check construction process, technology and inspection building decoration materials, presenting various jerry happens. Participate in each item construction, the acceptance of the project plan, coordinate civil engineering, installation, construction units with different municipal construction. Audit the construction units, and the amount of daily to guide the construction units to finish each time within the node. To ensure the project on time to meet the company completed or early production orders needs.
 On-site safety management, establish the management system, management, into three matters related to individual responsibility, every site inspections, all kinds of safe hidden trouble to find, construction units shall, in written documents within the rectification. Regular supervision construction unit organization workers, and put forward the concrete study relevant requirements, rewards and punishment system. Establishment of safety, and regularly check check.
 Organization and participate in the completion acceptance, not through the acceptance of the construction unit, supervision. After the completion of the rectification reinspection organization.
 Independently complete construction, construction planning, environmental protection, land, certificate (planning permission, construction permit, acceptance, building licensing archives, house property card, etc.).
 Familiar with construction, environmental protection, planning and other government departments for construction projects, the relevant policies and requirements for the amendment of policy, the design and construction of the project timely modification. Once informed on the road to the planning department of the height of the building and building density of the company, staff will be adjusted architectural design, avoid the loss due to late adjustment and cost of $700,000 and nearly a month's time.
 Factories after-care service charge already built , sporadic renovation project tendering and schedule, quality and cost control and materials.

Education and professional background

请帮忙翻译下

4. 计量经济学中 用R做的数据能帮我看看都是什么意思

你进行了回归建模,p小于0.05,是显著的
R2较低

5. 这几句话怎么翻译?claims在这里是什么意思?

楼下的翻译意思基本没错,有几点问题:
claims这里是名词"申请"= requests, demands
new claims for jobless benefits, 新申请失业救济

filing 登记。 申请了不一定会被登记,这里说的是已登记在案的那些新申请。
The number of Americans filing new claims for jobless benefits fell 
to a 14-year low last week...
上周,新登记失业救济申请的数字降到14年新低...

seasonally adjusted  季节调整。
失业率、消费力、农产品生产等在大范围统计时会有明显季节偏向,个别月份特别高,个别月份特别低等。因此为了得出准确数据和趋势,统计的时候会用专门的软件对数据进行调整,称为
seasonal adjustment。

失业率统计报告是每周更新一次的,因此是与前周作比较。
Initial claims for state unemployment benefits dropped 23,000 to a seasonally 
adjusted 264,000...
首次申请失业救济的人数较前一周下跌2万3千人,至季节调整后的26万4千人。

in the week ended Oct. 4 是指10月4号结束的那一周,即9月28-10月4号。
the number of people still receiving benefits after an initial week of aid rose 7,000 to 2.39 million in the week ended Oct. 4.
10月第一周失业救济申领超过一周的人数比前周上升7000人,达到2百39万。

这几句话怎么翻译?claims在这里是什么意思?

6. 如何用matlab和R语言画K线图

采用默认的ChartSeries绘制K线图  
library(quantmod)  
data_origin=read.csv("data.csv",header = F)
data<-data.frame(Open=data_origin[,2],High=data_origin[,3],Low=data_origin[,4],Close=data_origin[,5],Volume=data_origin[,7],Adjusted=data_origin[,6])
rownames(data)<-as.Date(as.character(data_origin$V1),"%Y%m%d")
chartSeries(data)

7. 数据库插入时出错为:Out of range value for column 'typeid' at row 1 原因是什么?

两种原因。第一种,我们从英文看出是因为字段长度不够用;第二种,新版本的MySQL对字段的严格检查。解决办法如下:

第一种原因解决办法
直接修改a字段的长度即可
还有一种情况会出现Out of range value adjusted for column 'ID' at row 1 如下面语句
MySQL升级到5.0.17后,在执行sql语句
INSERT INTO `news` (`ID`, `Title`, `Content`) VALUES ('', '标题', '正文');
第二种原因解决方法:
修改my.ini,将

sql-mode="STRICT_TRANS_TABLES,NO_AUTO_CREATE_USER,NO_ENGINE_SUBSTITUTION"
改为
sql-mode="NO_AUTO_CREATE_USER,NO_ENGINE_SUBSTITUTION"。
然后重新启动MySQL。

数据库插入时出错为:Out of range value for column 'typeid' at row 1 原因是什么?

8. 美股中的Open Close High Low MovAv AvgRange Volume 分别是什么 意思 求详解

Open:开盘价Close:收盘价High:最高价Low:最低价MovAv:移动平均线Avgrange:指的是这只股票平均的波动幅度Volume:成交量Laser II:不懂,其实Laser是目前在中国使用很广泛的一种美股交易软件。不知道你是不是要问Level II,Level II的意思是二级报价。拓展资料:求解释VAR1:=VOL/((HIGH-LOW)*2-ABS(CLOSE-OPEN)) VAR1:=VOL/((HIGH-LOW)*2-ABS(CLOSE-OPEN)):公式的全部是这样的(主动买盘和卖盘也不理解): VAR1:=VOL/((HIGH-LOW)*2-ABS(CLOSE-OPEN)); 成交:VOL,POINTDOT; 主动买盘:IF(CLOSE>OPEN,VAR1*(HIGH-LOW),IF(CLOSEOPEN,0-VAR1*((HIGH-CLOSE)+(OPEN-LOW)),IF(CLOSE0,VOL,0,2,1),COLORWHITE; STICKLINE(主动买盘>0,0,主动买盘,2,0),COLORRED; STICKLINE(主动卖盘)双针探底选股公式:LONG1:=HIGH-LOW; LONG2:=REF(HIGH,1)-REF(LOW,1); LONG3:=REF(HIGH,2)-REF(LOW,2); A:=(MIN(CLOSE,OPEN)-LOW)/LONG1; B:=(MIN(REF(CLOSE,1),REF(OPEN,1))-REF(LOW,1))/(REF(HIGH,1)-REF(LOW,1)); C1:=(MIN(REF(CLOSE,2),REF(OPEN,2))-REF(LOW,2))/(REF(HIGH,2)-REF(LOW,2)); D:=HHV(LONG1,120); ((A>0.567 AND A0.567 AND B0.567 AND C10.8 OR LONG2/D >0.8 OR LONG3/D >0.8)选股公式:MACD二次翻红:MACD第一次出现红柱后,由逐渐放大到逐渐缩小,缩小到绿柱还没出现时,红柱又开始出现并且逐渐放大,就是MACD连续二次或二次以上出现红柱(经常出现强势股!若均线形成多头排列,成交量放大,大幅上升的概率更大,有好几位朋友都说借助MACD二次翻红捕捉到涨停板) 黑马草上飞:1、60日价格平均线稳步上扬,呈一条斜线。 2、日K线按照60日均线的斜率震荡向上,远看像一片草原。 3、经过大约半年的震荡向上后,终于向上突破原有上升通道,进入飞扬阶段。 4、成交量集中在季价托或短长结合的价托之下,在股价飞扬前后并未有明显的放量。 操作方法:1、在价托形成后的回档介入。 2、在股价反复震荡的底部吸纳。 3、最节约时间和最大利润的办法是在股价飞扬前迅速介入。 出水芙蓉:出水芙蓉是非常典型的大牛股启动形态之一,无论是在长期震荡盘整低位区域还是牛股上升途中,该形态出现意味着主力开始新一轮征程,牛股狂欢将再一次拉开序幕。形态上,个股在横盘整理或下跌过程中,某天一根长阳突破了短期均线系统,必须要有较大成交量来配合。这就是出水芙蓉的基本特征。